| Trees | Indices | Help |
|
|---|
|
|
object --+
|
Element'.Element --+
|
Core.IdentifiedObject'.IdentifiedObject --+
|
Core.BasicIntervalSchedule'.BasicIntervalSchedule --+
|
Core.RegularIntervalSchedule'.RegularIntervalSchedule --+
|
GenUnitOpSchedule
The generating unit's Operator-approved current operating schedule (or plan), typically produced with the aid of unit commitment type analyses. The X-axis represents absolute time. The Y1-axis represents the status (0=off-line and unavailable: 1=available: 2=must run: 3=must run at fixed power value: etc.). The Y2-axis represents the must run fixed power value where required.The generating unit's Operator-approved current operating schedule (or plan), typically produced with the aid of unit commitment type analyses. The X-axis represents absolute time. The Y1-axis represents the status (0=off-line and unavailable: 1=available: 2=must run: 3=must run at fixed power value: etc.). The Y2-axis represents the must run fixed power value where required.
|
|||
|
|||
|
|||
|
|||
|
Inherited from Inherited from Inherited from |
|||
|
|||
_attr_types =
|
|||
_attrs =
|
|||
_defaults =
|
|||
_many_refs =
|
|||
_refs =
|
|||
|
Inherited from |
|||
|
|||
|
GeneratingUnit A generating unit may have an operating schedule, indicating the planned operation of the unit |
|||
|
Inherited from Inherited from Inherited from |
|||
|
|||
Initialises a new 'GenUnitOpSchedule' instance.
|
|
|||
GeneratingUnitA generating unit may have an operating schedule, indicating the planned operation of the unit
|
| Trees | Indices | Help |
|
|---|
| Generated by Epydoc 3.0.1 on Sat Jul 2 18:27:45 2011 | http://epydoc.sourceforge.net |