| Trees | Indices | Help |
|
|---|
|
|
|
|||
|
NonConformLoadSchedule An active power (Y1-axis) and reactive power (Y2-axis) schedule (curves) versus time (X-axis) for non-conforming loads, e.g., large industrial load or power station service (where modeled)- Because value1 will always be specified in MW and value2 will always be specified in MVAr, the value1Multiplier and value2Multiplier attributes do not need to be specified. |
|||
| Trees | Indices | Help |
|
|---|
| Generated by Epydoc 3.0.1 on Sat Jul 2 18:27:28 2011 | http://epydoc.sourceforge.net |